The potential off shore wind farm location is near "Water intake crib" which is around 3-4 miles off from the NW of the downtown Cleveland,OH.
Reasons for selecting this location:
1. There is estimated wind power of class 3 to class 5 in offshore areas of Lake Erie. Prevailing northerly and westerly winds have a long, smooth fetch across Lake Erie which results in strong winter and spring winds, especially along the coastal areas [1].
2. Already a pilot project is being done in the selected location.
3. BERR criterias: a) The average winds on the lake Erie are the highest recorded in the state. The average wind speed in the location is 16.4 mph which is excellent for power generation(utility scale wind farms require average of 15.7 mph). Prevailing winds are Southwest [2].
b) There could be impact on aquatic organisms, fishes due to placing the wind turbines , electrical cables. But this would not be a long term problem according to the study by DLZ Ohio Inc., a subcontractor to JW Great Lakes .
c) The nearest dwelling is around 12 miles from the location which satisfies the noise and shadow flicker problem criteria in BERR. According to the BERR criteria for noise, if the turbine to receptor is between 200 & 300 m, then noise power level is less than 50dBA. Also, source noise level of wind turbine is between 100-106dBA[3]. As regards to the nearest port "Cleveland" is nearly 16 miles from the location.
d) It being a off shore site, landscape visual impact would not be a reason for concern.
Sources:
[1] http://rredc.nrel.gov/wind/pubs/atlas/chp3.html#lake
[2](http://blog.cleveland.com/pdgraphics/2008/09/large_01FGWIND.jpg)
[3] http://www.berr.gov.uk/energy/sources/renewables/planning/onshore-wind/noise/page18728.html
Wednesday, April 22, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment